Concrete Slab Volume Basics

Cubic feet and yards for rectangular slabs.

Open free Concrete Volume calculator

Quick answer

Volume (ft³) = length (ft) × width (ft) × thickness (ft). Divide by 27 for cubic yards. Add waste before ordering.

Formula

ft³ = L × W × (thickness_in / 12). yd³ = ft³ / 27. order = yd³ × (1 + waste).

Units

Length and width in feet; thickness usually inches → divide by 12.

Step-by-step

  1. Measure length and width of the pour area.
  2. Confirm slab thickness (and thickened edges separately if needed).
  3. Compute ft³, then yd³.
  4. Add waste (often 5–10%) for subgrade and pump loss.

Example — 10×12 ft at 4 in

10 × 12 × (4/12) = 40 ft³ ≈ 1.48 yd³. With 8% waste ≈ 1.60 yd³ ordered.

Example — 20×24 ft garage at 6 in

20 × 24 × 0.5 = 240 ft³ ≈ 8.89 yd³. With 5% waste ≈ 9.3 yd³ — round to plant increments.

Common mistakes

  • Using inches for length/width in the same product as feet.
  • Ignoring thickened edges, turn-downs, or beam pockets.

Practical notes

  • Ready-mix has minimum loads — small slabs may still be bag territory.
  • After volume, use the bag calculator if you are not ordering a truck.

Related calculator

Use the free Concrete Volume Calculator to run the same math with your field numbers.

Related tools

Related guides

FAQ

How do I handle a slab with a thickened edge?

Compute the thin field volume plus the extra volume of the thickened perimeter (approximate as a rectangular ring).

Updated 2026-09-17. Planning aid only — verify against local codes and professional judgment.